top of page

History

▶ RhB_Jenaz, station reconstruction, project author (SIA phases 41–53)
▶ Post_Local construction management Post Landquart
▶ Support_Signalling_Level crossing Daillens_Post
▶ Post Real Estate_Extension of loading ramp and track
▶ asm_Support_Permit for breaking ground
▶ Teufen_GP ODT alternative tunnel variant
▶ BLS_Expansion Lötschberg Base Tunnel – Owner's Engineer (OE) Equipment LBT
▶ Holenstein AG_Preliminary investigations track connection
▶ RhB_Zuoz_Track monitoring
▶ Appenzeller Railways_Track monitoring
▶ asm FbE Täuffelen Hagneck
▶ SBB_ZSEB_Passing track for freight traffic
▶ BLS_Expansion LBT – HL03 Shell construction and tunnel equipment Engstlige
▶ Grimsel Railway_Alliance_Preliminary project
▶ Maintainability voestalpine fastening system
▶ TAZ_Implementation of immediate measures track system
▶ Civil Engineering Office Zurich BHU Connection tracks
▶ SZU Relocation SIW
▶ Relocation SIW NO 2 FS
▶ Rollout Hasi NO 2
▶ SBB_AS35 Expansion Baar – Zug (ABZ) General Planner – 32–53
▶ SBB WHZ Stäfa, Uerikon, Feldbach; Signal box replacement, external planning services
▶ SZU_8117_8315 FBE S10 Level crossing check
▶ SA in Project 8314 FE_ZGH-ZWIE Sidings
▶ Compagnie du Chemin de fer Montreux Oberland bernois_Planning services (SIA phases 41–53) for renewal of safety equipment on the Zweisimmen–Lenk SA railway line

bottom of page