top of page

Track construction Täuffelen–Hagneck

Client:

Aare Seeland mobil AG

Our task:

Project management and roadway planning

As part of the planned track renewal between Täuffelen and Hagneck, a further section of the line will be comprehensively renewed in 2026. The aim of the project is to ensure the long-term operational reliability and quality of the railway infrastructure.

The project is being carried out together with B+S AG on behalf of Aare Seeland mobil AG.


The planned works on the Täuffelen–Hagneck section include:

  • Replacement of the track ballast

  • Renewal of sleepers and rails

  • Rehabilitation of two level crossings


RUBI Bahntechnik is responsible for the overall project management, as well as the planning and design of the track, the tendering process, and local site supervision.

bottom of page